Die Kette by Get IT Done

Die Kette · Agents for Claude Code

Your design system, built by agents.

6 repos and 14 Figma files, all interlocked.

  • about250React components
  • over3,100Storybook stories
  • over6,200Figma variants
  • 26agents
Join the waitlist

Starts 1 November · from €249

claude
$ ● Loop started  Requirements, UX, UI, build,  then six independent gates.
Board page from the prototype, with a fictional sample tenant
  1. 01Prototype
  2. 02Tokens
  3. 03Figma
  4. 04Library
  5. 05Zero
  6. 06Zero Pages
  7. 07Apps

All interfaces on this page show fictional sample data.

Inside

What is inside the chain.

Counted from our repos. As of 18 Oct 2026.

  • Tokens

    1,564Tokens
    40theme files

    Light and dark, from one token repo.

  • Figma

    14files
    4,566variants in the base library

    In Figma, fed from the tokens.

  • Library

    145components
    2,485tests

    React components built on Radix (headless primitives), styled with tokens.

  • Zero

    100domain components
    981stories

    Domain components for business apps, built on the library.

  • Zero Pages

    18templates
    394states

    Page templates as stories, ready to use. You only connect your business logic.

  • Infrastructure

    13pipelines
    npmautomatic releases

    Visual regression tests, Figma sync and live deploys on itdone.cloud or your own infrastructure.

The problem

AI builds fast. But by gut feeling.

Without rules and independent review, every AI interface looks the same and breaks in the same places.

  • The agent reports done and checks its own work.
  • Contrast, focus and states are missing, and nobody notices.
  • Free skills suggest a style but enforce nothing.
Here is how we do it
Prototype page Skillmap with fictional data and marked sample findings B-07 Kontrastarmer Rand: falsche Rolle B-12 Fokusring fehlt B-31 Zustand fehlt: leer
Sample findings. The terms come from the causes in our audit.

Die Kette

Seven stations. One direction.

From prototype to app, every change flows in one direction, checked at every station.

The agents behind it

Arrows only point forward: Figma is checked against the tokens, never the other way round.

Making-of

You don't prompt this in an afternoon.

Growing in real projects since October 2023. With agentic support since 2026.

To the waitlist
  1. Tokens and library start. Figma and code are in sync from day one.
  2. The first business app builds on tokens and library from its very first commit.
  3. The app drives the library: multiselect with drag and drop, stepper, tooltip, skeleton, accordion.
  4. Relaunch of a client website: carousel, drawer and a services layout join the library.
  5. Table and new select fields for the app.
  6. Full time, non-stop from here. By 18 Oct 2026: 1,341 commits across the six chain repos.
  7. The first agents move in. From here on, with agentic support.
  8. Tokens v4, zero, the prototype and Zero Pages 1.0. Twelve more releases follow by 17 Oct.
  9. Audit of the base components. Findings named openly.
  10. Status: tokens 5.0.3, library 0.26.0, zero 0.13.0, Zero Pages 1.14.2.
  • 2,020commits in 6 repos
  • 218releases
  • 426fix, review and audit commits
  • 325agent runs in four weeks
  • 2,889tests in CI overall, all green
  • 720+person-days

Founder quote · personal statement

“About two years of development, many self-acting agents, countless Claude Max limits. Plus the know-how from more than 20 freelance projects at companies like Siemens Healthineers, Mercedes-Benz, Merck and Zeppelin. All of it is part of Die Kette.”

Alexander Friedl, Get IT Done GmbH

Verified

Evidence, not promises.

Every number comes from our repos. Including the uncomfortable ones.

  • 2,485tests, accessibility checked per story
  • 132rules, 52 do/don't pairs
Independent re-audit 18 Oct 2026

Critical findings fixed

Scope
Library and zero, light and dark, 1440 and 390 px
Verdict
fixed All critical findings, minor ones follow in 0.26.x
Fixed in
Library 0.26.0, tokens 5.0.2 and zero 0.13.0

Source: audit report and library 0.26.0 changelog. No client data.

Waitlist

Die Kette. From 1 November.

Our whole Design System and the agents that build it. Sign up and we will get in touch once, when sales start.

Die Kette

The whole Design System plus the agents that build and check it.

  • Tokens
  • React library
  • Domain components
  • Page templates
  • Figma files
  • Agents and skills

€249one-time, incl. VAT, 12 months of updates

Sales start on 1 November 2026

Join the waitlist

Months of team work, ready for €249.

The three packs compared
IncludedDesign review packAgent packRecommendedDie Kette
Price€49€149€249
132 rules✓included✓included✓included
26 agents×not included✓included✓included
18 skills×not included✓included✓included
1,564 tokens×not included×not included✓included
245 React components×not included×not included✓included
3,103 Storybook stories×not included×not included✓included
2,485 tests×not included×not included✓included
100 domain components×not included×not included✓included
18 page templates×not included×not included✓included
6,246 Figma variants×not included×not included✓included
Join the waitlistJoin the waitlistJoin the waitlist
over 720 person-days of work for €249

Prices for one person, one-time, incl. VAT, 12 months of updates.
Team of up to 10 people: €990 excl. VAT · Agencies on request (info@itdone.de)

Objections

Honest answers.

Even where the answer is no.

A finished Design System for complex business apps, plus the agents that build and check it. It all grew in our own projects.

From 1 November 2026. Until then, join the waitlist and we will get in touch once when sales start.

The agents do not. They are built for Claude Code.

No. The agents check against WCAG 2.2 AA and report findings with evidence. It does not replace a conformity assessment or a BITV test.

No personal support. You get the README for each plugin and this FAQ.

Your Design System, from 1 November.

Sign up. We will get in touch once, when it starts.