On your side
- Assessment
- Refactors and checks
- Build server
Migration
No rebuild. We attach your tokens, Figma files and repos to Die Kette, stage by stage.
The way
You can stop after any stage. What is done stays usable.
We count tokens, Figma files, components and apps.
Result: Inventory, drift report, fixed-price plan.
Your values move into a token repo, light and dark.
Result: One source for Figma and code.
Variables are generated from the tokens, a sync keeps them current.
Result: Figma and code speak the same values.
Components move into the library and page templates.
Result: Library with stories, tests and Code Connect.
Area by area, with pixel diff and review.
Result: Each area signed off on its own.
Releases, update PRs and drift checks run through gates.
Result: The system stays consistent.
Proof
Workbase moved this way: 39 areas, stage by stage.



Your own brands run as a theme on the same chain.
Fictional sample data. Source of the number: git history of our product repo, 8 to 19 Oct 2026.
On site
On request, the agents run on your own hardware, on site.
Claude via our business access or your own, e.g. AWS Bedrock in Frankfurt.
How we work
No figure without a look at your code.
A fixed price per stage.
If you do not run it yourselves.
Price: on request.
Request an assessmentFAQ
That depends on the assessment. The stages run one by one, old and new in parallel.
On request, most agents run on your hardware, and code and Figma files stay there. Only targeted steps go to Claude, with just the context the step needs.
Yes, then you get only the local steps. That takes longer, needs more person time and costs more.
You do. We set it up.
Yes. Every migration project includes the team license for Die Kette. So you can run operations yourselves with the same agents.
The Get IT Done GmbH team, with the agents of Die Kette. The agents do the bulk, people decide the architecture and sign off.
On request. Assessment first, then a fixed price for the migration.
Write to us. We start with the assessment.