Die Kette by Get IT Done

Migration

Already have a design system? We connect it.

No rebuild. We attach your tokens, Figma files and repos to Die Kette, stage by stage.

  • 6 stages, each runs on its own
  • 0 rebuild, your system stays the basis
  • On request price, after the assessment

The way

Six stages. Each with a result.

You can stop after any stage. What is done stays usable.

  1. Assessment

    We count tokens, Figma files, components and apps.

    Result: Inventory, drift report, fixed-price plan.

  2. Tokens as the single source

    Your values move into a token repo, light and dark.

    Result: One source for Figma and code.

  3. Re-chain Figma

    Variables are generated from the tokens, a sync keeps them current.

    Result: Figma and code speak the same values.

  4. Re-chain repos

    Components move into the library and page templates.

    Result: Library with stories, tests and Code Connect.

  5. Migrate apps

    Area by area, with pixel diff and review.

    Result: Each area signed off on its own.

  6. Ongoing operations with gates

    Releases, update PRs and drift checks run through gates.

    Result: The system stays consistent.

Proof

One value. Four stations.

Workbase moved this way: 39 areas, stage by stage.

  1. 01 Token value
  2. Figma documentation of a bar component, fictional sample data
    02 Figma variable
  3. Chart components from the library with sample values
    03 Library component
  4. Quote list in workload.zero with fictional sample data
    04 In the app

Your own brands run as a theme on the same chain.

  • Theme Default
  • Theme Brand A
  • Theme Brand B

Fictional sample data. Source of the number: git history of our product repo, 8 to 19 Oct 2026.

On site

Your own hardware. Agents on site.

On request, the agents run on your own hardware, on site.

On your side

  • Assessment
  • Refactors and checks
  • Build server

Via Claude

  • Architecture
  • Large refactors
  • Design reviews

Claude via our business access or your own, e.g. AWS Bedrock in Frankfurt.

How we work

Measure first. Then a fixed price.

  1. Assessment first

    No figure without a look at your code.

  2. Then a fixed price

    A fixed price per stage.

  3. Operations monthly

    If you do not run it yourselves.

Price: on request.

Request an assessment

FAQ

Questions from companies.

That depends on the assessment. The stages run one by one, old and new in parallel.

On request, most agents run on your hardware, and code and Figma files stay there. Only targeted steps go to Claude, with just the context the step needs.

Yes, then you get only the local steps. That takes longer, needs more person time and costs more.

You do. We set it up.

Yes. Every migration project includes the team license for Die Kette. So you can run operations yourselves with the same agents.

The Get IT Done GmbH team, with the agents of Die Kette. The agents do the bulk, people decide the architecture and sign off.

On request. Assessment first, then a fixed price for the migration.

Your system, on Die Kette.

Write to us. We start with the assessment.